E 25
Germany - Tank Destroyers
Development of the E 25 was a part of the "E" program, aimed at unifying the manufacture of the German armored forces. The program was supervised by the Waffenprüfamt 6 committee, directed by General Kniepkamp. The E 25 was developed by the Argus company (Karlsruhe, Germany). No prototypes were manufactured, the vehicle never underwent trials or saw service. However, according to some sources, by January 23, 1945, several hulls were produced and remained in Katowice waiting for trials.
Main Characteristics
Tier |
VII |
Hit Points |
830 HP |
Price |
1 |
Weight
|
14.98 t |
Speed Limit |
65 km/h |
Speed Limit Back |
20 km/h |
Hull Armor |
- Front:
- 50 mm
- Side:
- 30 mm
- Rear:
- 30 mm
|
Crew |
- Commander (Radio Operator)
- Gunner
- Driver
- Loader
|
Compare similar |
|
Turrets
Tier |
VII |
Turret |
Turret_1_E-25_IGR |
Armor |
- Front:
- mm
- Side:
- mm
- Rear:
- mm
|
Traverse Speed |
44 d/s |
Traverse Arc |
-12°/12 |
View Range |
360 m |
Weight |
100 kg |
Price |
100 |
XP |
0 |
Guns
Tier |
VI |
Ammo Capacity |
60 rounds |
Rate of Fire |
20.00 r/m |
Reload time |
3.00 s |
Clip |
/ |
Aim time |
1.50 s |
Accuracy |
0.30 m |
Elevation Arc |
|
Damage (Explosion radius) |
- AP
- 135 HP
- APCR
- 135 HP
- HE
- 175 HP (1.06 m)
|
Damage / min |
- AP
- 2700 HP/min
- APCR
- 2700 HP/min
- HE
- 3500 HP/min
|
Penetration |
- AP
- 150 mm
- APCR
- 194 mm
- HE
- 38 mm
|
Shell Speed |
- AP
- 925 m/s
- APCR
- 1156 m/s
- HE
- 925 m/s
|
Shell Price |
- AP
- 109
- APCR
- 7 (gold)
- HE
- 98
|
Weight |
955 kg |
Price |
53,000 |
XP |
0 |
Engines
Tier |
VIII |
Engine Power |
700 hp |
Fire Chance |
20 % |
Weight |
1,200 kg |
Price |
54,000 |
XP |
0 |
Suspensions
Tier |
VII |
Load limit |
29.00 t |
Traverse Speed |
44 d/s |
Weight |
9,000 kg |
Price |
12,860 |
XP |
0 |
Radios
Tier |
VI |
Signal range |
710 m |
Weight |
70 kg |
Price |
8,160 |
XP |
0 |