Comparing: Stuart I-IV vs. Pz.Kpfw. I Ausf. C
Mass-produced from 1941 and supplied to the U.K. under Lend-Lease. A a total of 6,889 were supplied to the British from M3 to M5A1 variants. The M3 tanks were designated Stuart I by the British, while the M3A1 version was designated Stuart III. They first saw action in the battle at Sidi Rezegh. |
The initial order for this tank was placed in 1939. It was originally conceived as a high-speed reconaissance tank for airborne units. Mass production started at the beginning of 1942. In early 1943 two vehicles were deployed with the 1st Tank Division. Another 38 vehicles were deployed with the 58th Reserve Tank Corps in the summer of 1944. |
||
Modules | |||
Auto select |
|
|
|
---|---|---|---|
Turrets | |||
Guns | |||
Engines | |||
Suspensions | |||
Radios | |||
Main Characteristics | |||
Tank data page | Tank data page | Tank data page | |
Tier | III | III | |
Battle Tiers | 3 4 5 | 3 4 5 | |
Price | 43,500 | 45,800 | |
Hit Points | |||
Signal range | |||
Speed Limit | 58 km/h | 79 km/h | |
Speed Limit Back | 20 km/h | 22 km/h | |
Weight | |||
Load limit | |||
Crew |
|
|
|
Armor | |||
Hull Armor |
|
|
|
Turret Armor | |||
|
|||
Mobility | |||
Engine Power | |||
Horse power / weight | |||
Traverse Speed | |||
Max Climb Angle | |||
Hard terrain resistance | |||
Medium terrain resistance | |||
Soft terrain resistance | |||
Fire Chance | |||
Engine Type | |||
Turret | |||
View Range | |||
Turret Traverse | |||
Traverse Arc | |||
Armament | |||
Damage (Explosion radius) | |||
Penetration | |||
Shell Price | |||
Shell Speed | |||
Damage / min | |||
Rate of Fire | |||
Reload time | |||
Clip | |||
Accuracy | |||
Aim time | |||
Elevation Arc | |||
Ammo Capacity | |||
Camo value | |||
Stationary | % | % | |
In motion | % | % | |
When Firing | % | % | |
Battle performance | |||
Accuracy | % | 45.4358 % | |
Neto Credits Income | -1564.79 | ||
Winrate | % | 50.6193 % | |
Damage dealt | 109.798 | ||
Kills per Battle | 0.415784 | ||
More stats @ vbaddict.net | More stats | More stats |