Comparing: BDR G1 B vs. Churchill III vs. KV-1

BDR_G1B

The project of a new vehicle was suggested by engineers of the Baudet-Donon-Rousell company in June 1938. However, the design was never developed.

Churchill_LL

A British tank supplied to the U.S.S.R. under Lend-Lease. The U.S.S.R. received a total of 301 vehicles, with some lost at sea during transport to Murmansk.

KV1

Development started at the end of 1938. A prototype was produced in August 1939. The vehicle first saw combat in December 1939 at the Mannerheim Line. The tank was mass-produced from March 1940 through August 1942, with a total of 2,769 vehicles manufactured.

Modules
Auto select
Turrets
Guns
Engines
Suspensions
Radios
Main Characteristics
Tank data page Tank data page Tank data page Tank data page
Tier V V V
Battle Tiers 5 6 7 5 6 5 6 7
Price 400,000 1,500 390,000
Hit Points
Signal range
Speed Limit30 km/h28 km/h34 km/h
Speed Limit Back10 km/h14 km/h10 km/h
Weight
Load limit
Crew
  • Commander
  • Gunner
  • Driver
  • Radio Operator
  • Loader
  • Commander
  • Gunner
  • Radio Operator
  • Driver
  • Loader
  • Commander
  • Gunner
  • Radio Operator
  • Driver
  • Loader
Armor
Hull Armor
Front:
60 mm
Side:
40 mm
Rear:
60 mm
Front:
176 mm
Side:
76.2 mm
Rear:
50.8 mm
Front:
75 mm
Side:
75 mm
Rear:
70 mm
Turret Armor
Mobility
Engine Power
Horse power / weight
Traverse Speed
Max Climb Angle
Hard terrain resistance
Medium terrain resistance
Soft terrain resistance
Fire Chance
Engine Type
Turret
View Range
Turret Traverse
Traverse Arc
Armament
Damage (Explosion radius)
Penetration
Shell Price
Shell Speed
Damage / min
Rate of Fire
Reload time
Clip
Accuracy
Aim time
Elevation Arc
Ammo Capacity
Camo value
Stationary11.50 %13.50 % %
In motion7.00 %9.00 % %
When Firing2.93 %3.82 % %
Battle performance
Accuracy63.1557 %62.2266 % %
Neto Credits Income4264.025129.82
Winrate50.9502 %52.2617 % %
Damage dealt411.737403.375
Kills per Battle0.7086240.771973
More stats @ vbaddict.net More stats More stats More stats