Comparing: Kirovets-1 vs. WZ-111

R123_Kirovets_1

The Kirovets-1 project (IS-3, prototype No. 1) was developed from July through November 1944. The prototype was built at the Chelyabinsk Kirov Plant in September–October 1944. From December 18 through December 24, 1944, the vehicle underwent trials at the NIBT proving grounds in Kubinka. After it was decided to manufacture a pilot series of the modified IS-2 with a hull proposed by engineers of Plant No. 100 and Сentral Research Institute-48, the work on the Kirovets-1 was discontinued.

Ch03_WZ-111

Development of the heavy tank prototype on the basis of the Soviet IS-2 and IS-3 began in the early 1960s under the influence of the T-10. The vehicle was supposed to modernize the armored forces of the PLA. The trials revealed multiple faults, and the development of the vehicle was discontinued in 1964.

Modules
Auto select
Turrets
Guns
Engines
Suspensions
Radios
Main Characteristics
Tank data page Tank data page Tank data page
Tier VIII VIII
Battle Tiers 8 9 10 8 9 10
Price 10,700 12,250
Hit Points
Signal range
Speed Limit42 km/h50 km/h
Speed Limit Back20 km/h15 km/h
Weight
Load limit
Crew
  • Commander (Radio Operator)
  • Driver
  • Gunner
  • Loader
  • Commander (Radio Operator)
  • Gunner
  • Driver
  • Loader
Armor
Hull Armor
Front:
120 mm
Side:
100 mm
Rear:
60 mm
Front:
120 mm
Side:
120 mm
Rear:
60 mm
Turret Armor
Mobility
Engine Power
Horse power / weight
Traverse Speed
Max Climb Angle
Hard terrain resistance
Medium terrain resistance
Soft terrain resistance
Fire Chance
Engine Type
Turret
View Range
Turret Traverse
Traverse Arc
Armament
Damage (Explosion radius)
Penetration
Shell Price
Shell Speed
Damage / min
Rate of Fire
Reload time
Clip
Accuracy
Aim time
Elevation Arc
Ammo Capacity
Camo value
Stationary %6.85 %
In motion %3.47 %
When Firing %1.04 %
Battle performance
Accuracy %74.1134 %
Neto Credits Income5991.38
Winrate %48.1 %
Damage dealt1150.59
Kills per Battle0.799946
More stats @ vbaddict.net More stats More stats